The Coomera Connector Stage 1 South Early Works Project was delivered in accordance with Queensland Department of Transport and Main Roads (TMR) specifications, design requirements and governance frameworks. Coomera Connector (Stage 1) is a 16km corridor delivered in three construction packages, with Winslow successfully delivering the early works for the Southern package between the Nerang River and Nerang-Broadbeach Road. Works focused on construction and earthworks for a 1.6km highway embankment, including soft soil treatment through surcharge to achieve settlement requirements.
The early works contract included earthworks preload, settlement monitoring systems and relocation of Public Utility Plant (City of Gold Coast sewer main), incorporating permanent rockfill bridging, high permeability drainage layers and surcharge fill up to 1 metre above Finished Surface Level.