Skip to main content

Coomera Connector

Stage 1 South – Early Works

Infrastructure

  • Location
    Nerang, Gold Coast
  • Client
    Department of Transport and Main Roads
  • Industry Sector
    Infrastructure

Other Winslow Solutions involved in the project

  • Major Road Projects
  • Environmental
  • Plant and Equipment
  • Surveying

The Coomera Connector Stage 1 South Early Works Project was delivered in accordance with Queensland Department of Transport and Main Roads (TMR) specifications, design requirements and governance frameworks. Coomera Connector (Stage 1) is a 16km corridor delivered in three construction packages, with Winslow successfully delivering the early works for the Southern package between the Nerang River and Nerang-Broadbeach Road. Works focused on construction and earthworks for a 1.6km highway embankment, including soft soil treatment through surcharge to achieve settlement requirements.  

The early works contract included earthworks preload, settlement monitoring systems and relocation of Public Utility Plant (City of Gold Coast sewer main), incorporating permanent rockfill bridging, high permeability drainage layers and surcharge fill up to 1 metre above Finished Surface Level. 

Key Achievements

  • High-Volume Material Delivery, Winslow coordinated the delivery of 620,000 tonnes of material, achieving a peak of 10,469 tonnes delivered in a single day. 
  • Civil Infrastructure & Services Delivery, Winslow completed 340 m³ of concrete works, 120 metres of sewer, 232 metres of electrical services and 100 tonnes of asphalt for driveway access. 
  • Local Industry & Workforce Contribution, Winslow achieved 53,600 work hours, with 100% of project spend directed to local South East Queensland suppliers and subcontractors. 

Providing certainty, capability
and a genuine commitment to success.

Start A Project with Us Today