- Location:
Strathalbyn , South Australia
- Client:
Wel.Co
- Industry Sector:
Residential Subdivision Land Development
- Key Achievement :
Air is Winslow’s first project in South Australia.
Stage 1 consists of the first 20 lots of an approximate 110-lot subdivision within the Alexandrina Council. The project is situated adjacent to the Angas River and comprises lot sizes ranging from 663m2 to 2000m2. It involves bulk earthworks, sewer, stormwater, water, electrical, and communication infrastructure, along with new roads and footpaths to serve the new community.
- Business Units:
Constructors
- Location:
Ripley, Queensland
- Others Solution:
Residential
- Key Achievement :
Self-perform bulk earthworks operations using Winslow plant.
Large scale export project.
Six separate portions being constructed at once.
Amory at Ripley is a master-planned community located just 10 mins from Ipswich in the heart of Ripley Valley. Construction of Phase 1 works consist of clearing, bulk earthworks to Stages 1 – 4, Ripley Road intersection, external link road, Stage 1 and 2 civil stages and an external sewer. Winslow has been actively engaged in the initial stages, assisting the client to descope where possible and offering local expertise in the design and programming of the project.
- Business Units:
Constructors
- Location:
Skennars Head, NSW
- Client:
Intrapac Properties Pty Ltd
- Others Solution:
Residential
- Key Achievement :
More than 400 residential lots
External Road Upgrade
External Services Upgrades
NSW Workcover provided Winslow with a letter of commendation for outstanding safety management and
safety performance after a random inspection.
Construction of two new roundabouts working under live traffic.,
Construction of a pedestrian underpass.
Construction of a new trunk sewer main and sewer pump station.
Extensive bulk earthworks, including blasting, crushing and screening rock.
This prestigious residential estate is located on a rise between the Pacific Ocean, a protected wetlands, established high end housing, and farmland, and was classified as a high value cultural heritage site. Very strict environmental and construction constraints formed part of the DA requirements for the project and as such, high levels of environmental and cultural heritage management and protection were required throughout works.
- Business Units:
Constructors
- Location:
Nar Nar Goon, Victoria
- Client:
Lendlease Communities
- Industry Sector:
Greenfield Residential Subdivision
- Others Solution:
Residential, Utilities, Plant and Equipment, Surveying, Traffic Management
- Key Achievement :
- Construction of VicRoads Signalised Intersection on the Princes Hwy.
- Construction of Sewer Pump Station
- Construction of Water Booster Pump Station
- Protection of Existing twin gas mains which supply 70 per cent of Melbourne’s Gas
- 6-star Green star Community encompassing the use of recycled products & waste management.
- Implementation and adherence to the Lendlease GMRs (Global Minimum Requirements) for safety standards.
- Construction of all drainage, sewer, water, gas and electrical services, and associated road infrastructure to facilitate about 300 homes in 2022/23.
Averley Estate is situated in Nar Nar Goon, located 65km southeast of Melbourne’s CBD and only 5 minutes away from the Pakenham Town Centre, encompassing over 113ha. The estate will contain 1500 residential lots and 20ha of planned park lands and reserves. The final vision of the community is anticipated to include a new primary school and community centre. Sustainability is ingrained throughout the project with a focus on low energy impact, utilising recycled water, and providing fibre optic network connections through the community.
- Business Units:
Constructors
- Location:
Ballina, NSW
- Client:
Intrapac Properties Pty Ltd
- Industry Sector:
Residential
- Others Solution:
Residential
- Key Achievement :
Extension of Ballina Heights Drive.
Upgrades to external hydraulic and electrical services.
Bulk earthworks incorporating large stormwater detention basins; retaining walls.
Road construction.
Concrete works.
Electrical reticulation.
Hydraulic services, including individual stormwater detention tanks and systems to every lot to assist in controlling increased stormwater runoff entering the wetlands.
More than 7km of fauna fence through very rugged terrain to protect the native wildlife.
Banyan Hills Estate is located on the crest of a hill at the top of Cumbalum, overlooking Ballina with views of the Pacific Ocean. The site presents many challenges including topography that ranges from 4m to 82m above sea level and all falling towards a protected wetland and gazetted waterway. These natural features resulted in very strict environmental and construction constraints forming part of the DA requirements.
- Business Units:
Constructors
- Location:
Grampian Drive, Deebing Heights, Queensland
- Client:
Stockland
- Industry Sector:
Residential
- Others Solution:
Residential
The Botanica Trunk Sewer line will provide critical sewer infrastructure for Stockland’s Botanica master-planned community, Moremac’s South Place community and AV Jennings Deebing Springs community. The trunk sewer is to be constructed in two separable portions with the first to commence in late July 2024. The project consists of more than 2km of deep trunk sewer, construction of large stormwater culverts and a foot bridge over Deebing Creek
- Business Units:
Infrastructure
- Location:
Yarraville, Victoria
- Client:
Yarraville Development JV Pty Ltd
- Industry Sector:
Industrial, Environment
- Key Achievement :
- Disposal of less than 20% of all abated materials which include contaminated materials, rock for offsite disposal and asbestos in soil.
- Re-use >90% of all excavated materials as fill by reprocessing midstream yield materials from screening process.
- Traceability of materials through EPA tracker identification to sustain audit requirements.
- Through pro-active planning and implementation of the site specific environmental, asbestos, noise, dust, waste and water management plans, Winslow excelled on Project’s and Client’s environmental targets. The project also worked within the EPA and local Council requirements, which focussed on the protection of the surrounding environment with emphasis on the residential housing.
The former Bradmill Industries Limited textile factory was at one time, the country’s first and only manufacturer of denim, as well as a leading supplier of cotton workwear including iconic Aussie brand, King Gee. Established on site in 1938 and shuttered 67 years later, the 26-hectare factory site was disused for >16 years until recently given a new lease of life.
Winslow Infrastructure is undertaking remediation works at the site with an environmental overlay for re-development.
The Winslow Constructors team in Shepparton, in Victoria’s Goulburn Region, has hit the ground running at Uptown Estate, with our earthworks crews making an impressive start onsite.
With favourable conditions the team has quickly been able to strip the topsoil with our scrapper fleet and we now have the cut-to-fill operation well underway.
We will shortly have the site ready for sewer and drainage as we continue to get Uptown ready for success.
- Business Units:
Constructors
- Location:
Fyansford, Geelong
- Client:
ICD Property and Project Managed through Sinclair Brook
- Industry Sector:
Residential Sub-divisions, Land Remediation
- Others Solution:
Residential, Utilities, Plant and Equipment, Surveying, Traffic Management
- Key Achievement :
- Started in May 2018, at a high-profile location in Geelong. To date, the value of the project is over $50 million dollars.
- As part of the quarry rehabilitation over a 1,000,000 tonne of rock and fill placed
- Community to have 1100 lots to be built with already 400+ lots delivered to date
- Over 300,000 tonnes of rock blasted
- Signalised VicRoads Intersection constructed
- Installed and commissioned the 1st Sewer Pump Station along with significant boring works under the Moorabool River.
- Over a 1km of large external water and gas works along the Hamilton Hwy to connect into the estate.
- Recent works have included rehabilitation of ground water ponds into developed residential lots for housing.
- Construction of 1km drainage outfall – in groundwater conditions.
Started in May 2018 to remediate and develop at disused Geelong quarry into a thriving 1100 lot residential neighborhood. As part of the quarry remediation more than 300,000 tonnes of rock was blasted with more than 1,000,000 tonne of rock and fill material placed. Winslow has delivered a major highway signalised intersection and over 1km of external services connecting in the new community. Recent works have included rehabilitation of ground water ponds into developed residential lots for housing.
- Business Units:
Constructors
- Location:
Sawmill Road, Huntly Vic
- Client:
Wel.Co
- Industry Sector:
Residential Land Remediation
- Others Solution:
Residential, Utilities, Landscaping, Plant and Equipment, Surveying, Traffic Management
- Key Achievement :
Successfully priced and won Stages 1 to 6 (individually) over a 6-to-12-month period.
Harlowe is a 400-lot land subdivision north of Bendigo CBD. Lots vary in size from 300m2 to 1159m2.
Currently construction Stages 1 to 3 with stages 4 and 5 due to commence Q4 2022 and Stage 6 Q1 2023.
- Business Units:
Constructors
- Location:
Donnybrook, Victoria
- Client:
Stockland
- Industry Sector:
Residential Sub-divisions
- Others Solution:
Residential, Utilities, Plant and Equipment, Surveying, Traffic Management
- Key Achievement :
- 8 Stages
- intersection and wetland completed within 24 months
- All delivered ahead of program.
Katalia is located in Donnybrook, Victoria consisting of about 1500 housing lots on completion. Winslow successfully completed 377 of these lots within the first two years of construction. The estate includes a number of local parks, a sports reserve and a future school site. Construction has included a large main drain, intersection and wetland to date.
- Sub-Heading to project name:
Stage 1
- Business Units:
Constructors
- Location:
Wodonga, Victoria
- Client:
Duvoux Land Development
- Industry Sector:
Land Development, Green Fields
- Others Solution:
Residential, Utilities, Plant and Equipment, Surveying, Traffic Management
Located in Wodonga's growth corridor and forming part of the Leneva-Baranduda Precinct Structure Plan, this substantial 82.92ha (204.89acres) englobo parcel is located 7km (approx.) south-east of Wodonga's CBD, zoned: UGZ1 (Urban Growth - schedule 1) and holds one title spread across four lots.
This unique development opportunity (STCA) offers potential purchasers the chance to significantly contribute to the future development of the Leneva-Baranduda Precinct with an estimate 6000 dwellings, future schools, community centres, sporting fields, cycling and pedestrian networks.
Winslow Constructors’ Geelong Region team joined developer Stockland at Banksia Estate recently for a “Little Diggers” community event.
It was a chance for the local community children to see Winslow machines up close.
Winslow began working on Banksia two years ago, which is located in Armstrong Creek, south of Geelong, and has completed five stages to date.
The project includes an intersection on Boundary Rd, with another two stages underway and a further five stages to be constructed over the next 18 months to two years.
- Business Units:
Constructors
- Location:
Berwick, Victoria
- Client:
Stockland Development
- Industry Sector:
Civil Construction – Subdivisional Works
- Others Solution:
Residential, Utilities, Landscaping, Plant and Equipment, Surveying, Traffic Management
- Key Achievement :
Construction of a North South Arterial Road eventually connecting Grices Road to Oshea’s Road entry to the Monash Freeway, which was a key component of local government and Council planning for the growth of the area and assisted with the easing of congestion on local roads with the Berwick and Clyde North area now having alternative freeway access.
Successful implementation of recycled products, including but not limited to Reconophalt (Recycled Asphalt).
Minta Farm estate accommodates 314 medium density, 330 small and 938 houses, totaling 1582 lots within Berwick. The estate is located between the Monash Freeway and Grices Road with a future connection directly to the Oshea’s Road freeway entrance. The estate also includes 5.03 ha of Credited open space that have been divided into four public park lands. Construction commenced in February of 2019 and continues to be constructed with 16 stages remaining.
- Business Units:
Constructors
- Location:
Donnybrook, Victoria
- Client:
Mirvac
- Industry Sector:
Residential Sub-divisions
- Others Solution:
Residential, Utilities, Landscaping, Plant and Equipment, Surveying, Traffic Management
- Key Achievement :
1000 lots delivered to date, four signalised intersections, three wetlands and an active open space in very difficult rocky ground conditions.
Olivine is a large housing estate located in Donnybrook, Victoria offering over 2000 lots, several local open spaces, a school, a childcare center, fully serviced cafe and active open spaces. Construction has included large scale bulk earthworks, main drains, major intersections, branch sewer, trunk water mains as well as other major infrastructure.
- Video iFrame Link:
- Video Thumbnail:
Winslow Constructors’ West Region team has been busy working with YourLand Developments to transform a former quarry located on the Maribyrnong River, into a residential estate.
The team has been onsite at River Valley Estate in Sunshine North for the past five years completing stages 7A through to 7C and is now working on 7D.
The estate lies on a steep embankment requiring complex earthworks, retaining walls and interface with the river.
More than 250,000m3 of cut has been completed, with some areas requiring a cut of up to 12m.
There has also been about 230,000m3 of fill placed to a depth of up to 13m, particularly in the 7D park at the interface with the existing quarry wall.
Working alongside developer YourLand, and its design team CJ Arms and Douglas Partners, our team has been able to repurpose site-generated materials to construct rock-faced, earth-reinforced retaining walls, which have significant environmental benefits when compared to conventional concrete retaining walls.
- Business Units:
Constructors
- Location:
Clyde North, Victoria
- Client:
Mirvac
- Industry Sector:
Residential Land Development
- Others Solution:
Residential, Utilities, Plant and Equipment, Surveying, Traffic Management
- Key Achievement :
Since construction started in 2019, Winslow have completed 15 stages and wetland delivered in a short span of four years.
Within these stages, an estimated 770 lots have been completed with numerous active stages currently being constructed.
Smiths Lane in Clyde North is a planned community estate on a 260ha site located about 55km south-east of Melbourne. The masterplan of the estate is expected to deliver more than 3000 lots over the next 10 years. Construction commenced late 2019 and will be home to over 7500 residents, with more than 56ha of public open space planned. The estate will include amenities such as a Town Centre, government primary school, private primary/secondary school with several open space precincts including sporting ovals and local parks.
- Business Units:
Constructors
- Location:
Point Lonsdale, Victoria
- Client:
Moremac
- Industry Sector:
Residential Sub-divisions
- Others Solution:
Residential, Utilities, Plant and Equipment, Surveying
- Key Achievement :
- Delivering over 600 residential and retirement lots in Point Lonsdale.
- Winner of the UDIA award for Environmental Excellence Award.
- The Point development in Point Lonsdale is a highly environmentally sensitive project with the proximity of the Swan Bay Marine National Park.
- This project entailed construction of a new round about & installation of large culvert structures under the Bellarine Hwy and Queenscliff Rail Trail.
- The construction of three vehicle bridges and two pedestrian bridges.
For more than 10 years Winslow has been constructing The Point Estate with more than 600 residential and retirement lots in Point Lonsdale.
The project boasts the challenge of realigning and protecting kilometers of active highly significant active environmental waterways.
The project included a new roundabout entrance along the Bellarine highways and construction of three vehicle and two pedestrian bridges.
- Business Units:
Constructors
- Location:
Mt Duneed, Victoria
- Client:
Armstrong Creek Development Corporation
- Industry Sector:
Residential Sub-division
- Others Solution:
Residential, Utilities, Landscaping, Plant and Equipment, Surveying, Traffic Management
- Key Achievement :
- Award winning - 2019 UDIA Masterplanned Development Award, Environmental excellence Award & 2019 UDIA National Awarded for Excellence
- Delivered over 4500 residential lots
- Multiple wetlands constructed and existing creek re-alignments
- As part of over development Winslow constructed delivered the civil works for the Neighbourhood Activity Centre (NAC) located along Barwon Heads Rd.
Winslow has been a part of this project for more than 12 years and delivered more than 4500 residential lots to date with about 5500 lots to complete the estate. This long staying and successful project entailed multiple VicRoads intersections, wetlands construction, environmental significant creek re-alignments and external service installations.
Winslow collaborates with various groups to provide opportunities to different community groups, and we value using and passing on knowledge.
Chaya, a Winslow Constructors Site Engineer, has been mentoring university students studying for careers in the construction industry.
The Buddy Program is run by the National Association of Women in Construction (NAWIC) Victoria Education Committee to help students navigate the transition from university to industry, and successfully integrate into the workforce.
The program is available for Engineering, Construction Management, Project Management and Architecture students of all genders.
Chaya is one of 33 ‘buddies’ who have volunteered to participate in the program to mentor one to two students.
“I wanted to participate as I had an interesting journey into the industry,” Chaya said.
“I also wanted to promote Winslow’s priority to employ people who show initiative and promise.”